Senior Manager – System Design & Costing (BESS)
Waaree Group
12 - 14 years
Mumbai
Posted: 08/01/2026
Job Description
Senior Manager System Design & Costing (BESS)
Location: Mumbai
Reporting To: Pre-sales - Lead (BESS)
About the Company
Waaree is expanding its Battery Energy Storage Systems (BESS) business across utility-scale and commercial & industrial segments. As BESS projects scale in size and complexity, accurate system design, technical configuration, and cost modelling for the entire BESS project is critical for winning bids and protecting margins.
About the Role
The Senior Manager System Design & Costing (BESS) will own end-to-end system architecture, technical configuration, and cost modelling for BESS projects, covering battery systems, PCS, balance-of-system design & equipment. This role acts as the single owner of technical and cost assumptions during the bid and proposal stage, ensuring that solutions offered are technically compliant, commercially accurate, and executable.
Responsibilities
System Design & Architecture
Define overall system architecture for BESS projects across utility-scale and C&I applications
Finalise technical configuration covering:
Battery containers / racks
PCS selection and sizing
Transformers, switchgear, protection systems, metering, and auxiliary systems up to the POI
Own sizing philosophy, design assumptions, and technical compliance for bids
Review and approve SLDs, layouts, and system-level design documentation
Costing & Commercial Support
Own complete project-level cost models covering:
BESS equipment and auxiliaries
Electrical systems and infrastructure from PCS up to the POI
Installation, testing, commissioning, logistics, duties, and contingencies
Prepare and validate BOMs, cost sheets, and pricing inputs for bids
Work closely with sourcing and procurement teams to validate vendor pricing
Support sales teams with margin analysis and sensitivity scenarios
Standardisation & Value Engineering
Develop standard system configurations and reference designs for faster bid turnaround
Drive value engineering initiatives to optimise system cost while meeting performance and safety requirements
Create cost benchmarks for different project sizes, grid conditions, and use cases
Bid Review & Risk Management
Participate in bid review meetings to validate technical and cost assumptions
Identify key technical, execution, and commercial risks related to design and POI integration
Provide recommendations on risk mitigation and pricing strategy
Cross-Functional Coordination
Work closely with pre-sales, sales, sourcing, and project execution teams
Ensure smooth technical handover from bid stage to execution
Support execution teams during early project stages to maintain design intent and cost assumptions
Knowledge Management & Team Development
Build internal capability in BESS system design and costing
Mentor junior engineers and pre-sales team members
Develop internal design standards, costing templates, and technical playbook
Qualifications
Bachelors degree in Electrical / Power / Energy Engineering (Masters preferred)
812 years of experience in power systems, renewables, or energy infrastructure
At least 35 years of direct experience in BESS system design, solution engineering, or pre-sales
Strong exposure to system integration and costing up to the Point of Injection
Required Skills
BESS system architecture and operating philosophy
Battery technologies (LFP / NMC), degradation, and lifecycle modelling
PCS characteristics and system limits
Electrical systems, protection philosophy, and grid interconnection up to POI
Applicable standards, certifications, and grid requirements
Preferred Skills
Experience with project management tools and methodologies
Strong analytical and problem-solving skills
Excellent communication and interpersonal skills
Services you might be interested in
Improve Your Resume Today
Boost your chances with professional resume services!
Get expert-reviewed, ATS-optimized resumes tailored for your experience level. Start your journey now.
