🔔 FCM Loaded

SCADA RTU Engineer

Anicalls (Pty) Ltd

2 - 5 years

Bengaluru

Posted: 31/01/2026

Getting a referral is 5x more effective than applying directly

Job Description

Configure ASE2000 V2 to simulate real field RTUs and their associated points status, analog, and accumulator
Perform point-to-point testing between D-SCADA and the simulated RTU, including supervisory control verifications and confirmation of status changes initiated at the simulated RTU
Verify handling of telemetry error/communication error handling, print quality (color), analog/accumulator accuracy, and alarming within D-SCADA
Work with the Project System Integration (SI) Team to connect ASE2000, so the simulator can be scanned by the D-SCADA system (OSI Monarch)

Services you might be interested in

Improve Your Resume Today

Boost your chances with professional resume services!

Get expert-reviewed, ATS-optimized resumes tailored for your experience level. Start your journey now.