🔔 FCM Loaded

Lead – BESS Integration

Waaree Group

12 - 14 years

Mumbai

Posted: 08/01/2026

Getting a referral is 5x more effective than applying directly

Job Description

Lead BESS Integration

Location

India Project Site Based (with travel across India)

Office base: Mumbai (Travelling to site as per the project requirements)


Role Objective

The BESS Integration Lead will be responsible for on-site integration of Battery Energy Storage Systems with the grid , covering Installation & Commissioning (I&C), EMS implementation, testing, SAT, and grid compliance . The role ensures safe, compliant, and reliable commissioning of utility-scale BESS projects in coordination with OEMs, EPCs, and grid authorities.


Key Responsibilities

BESS Integration & Commissioning

  • Lead end-to-end site integration of BESS including batteries, PCS, transformers, switchgear, protection systems, and grid interface
  • Manage Installation & Commissioning (I&C) activities for containerized BESS systems
  • Ensure proper integration of BESS with grid, renewable plants, and auxiliary systems

EMS, SCADA & Controls

  • Implement and validate EMS functionality including:
  • Charge/discharge control
  • Peak shaving, frequency regulation, and dispatch logic
  • Grid compliance and communication with SCADA / SLDC systems
  • Coordinate OT/IT integration, communication protocols, and cybersecurity requirements as per CEA guidelines

Testing, SAT & Grid Compliance

  • Lead Testing & Commissioning (T&C) including:
  • Pre-commissioning checks, MIRU, insulation resistance, functional testing
  • SAT, performance tests, response time tests, and trial runs
  • Ensure compliance with:
  • Indian Grid Codes and CEA regulations
  • Fault Ride Through (FRT), protection coordination, islanding, black start (where applicable)
  • Support grid synchronization and approvals from DISCOMs / SLDCs

Engineering & Technical Support

  • Review and validate:
  • Single Line Diagrams (SLDs)
  • Protection schemes and control philosophy
  • Support load flow, short circuit, and dynamic simulations (in coordination with engineering teams)
  • Assist BD and project teams during technical clarifications, tender evaluations, and compliance documentation

Safety & Standards

  • Ensure compliance with:
  • Battery safety standards (UL9540A, IEC 62933, IEC 62619)
  • Fire detection and suppression systems
  • Electrical and site safety practices
  • Drive safe commissioning practices and permit-to-work systems on site

Stakeholder Coordination

  • Act as primary technical interface on site with:
  • OEMs (cell, PCS, EMS)
  • EPC partners
  • DISCOMs, SLDCs, and third-party inspectors
  • Coordinate issue resolution to meet project timelines and performance benchmarks


Required Qualifications & Experience

Experience

  • 712 years of experience in:
  • BESS, power systems, grid integration, or renewable energy projects
  • Hands-on experience in utility-scale BESS commissioning and grid integration is mandatory
  • Experience working with Indian DISCOMs / SLDCs is strongly preferred

Technical Skills

  • Strong understanding of:
  • BESS system architecture (battery sizing, PCS, HVAC, fire systems)
  • EMS, SCADA, protection systems, and grid interface
  • Familiarity with Indian regulatory framework for BESS applications:
  • Renewable integration
  • Frequency regulation
  • Peak shaving / capacity support

Tools & Standards

  • Experience with power system studies tools (ETAP / PSCAD / DIgSILENT working knowledge acceptable)
  • Knowledge of CEA regulations, grid codes, and safety standards

Education

  • BE / BTech in Electrical Engineering (mandatory)
  • MTech in Power Systems (preferred)

Services you might be interested in

Improve Your Resume Today

Boost your chances with professional resume services!

Get expert-reviewed, ATS-optimized resumes tailored for your experience level. Start your journey now.