Lead – BESS Integration
Waaree Group
12 - 14 years
Mumbai
Posted: 08/01/2026
Job Description
Lead BESS Integration
Location
India Project Site Based (with travel across India)
Office base: Mumbai (Travelling to site as per the project requirements)
Role Objective
The BESS Integration Lead will be responsible for on-site integration of Battery Energy Storage Systems with the grid , covering Installation & Commissioning (I&C), EMS implementation, testing, SAT, and grid compliance . The role ensures safe, compliant, and reliable commissioning of utility-scale BESS projects in coordination with OEMs, EPCs, and grid authorities.
Key Responsibilities
BESS Integration & Commissioning
- Lead end-to-end site integration of BESS including batteries, PCS, transformers, switchgear, protection systems, and grid interface
- Manage Installation & Commissioning (I&C) activities for containerized BESS systems
- Ensure proper integration of BESS with grid, renewable plants, and auxiliary systems
EMS, SCADA & Controls
- Implement and validate EMS functionality including:
- Charge/discharge control
- Peak shaving, frequency regulation, and dispatch logic
- Grid compliance and communication with SCADA / SLDC systems
- Coordinate OT/IT integration, communication protocols, and cybersecurity requirements as per CEA guidelines
Testing, SAT & Grid Compliance
- Lead Testing & Commissioning (T&C) including:
- Pre-commissioning checks, MIRU, insulation resistance, functional testing
- SAT, performance tests, response time tests, and trial runs
- Ensure compliance with:
- Indian Grid Codes and CEA regulations
- Fault Ride Through (FRT), protection coordination, islanding, black start (where applicable)
- Support grid synchronization and approvals from DISCOMs / SLDCs
Engineering & Technical Support
- Review and validate:
- Single Line Diagrams (SLDs)
- Protection schemes and control philosophy
- Support load flow, short circuit, and dynamic simulations (in coordination with engineering teams)
- Assist BD and project teams during technical clarifications, tender evaluations, and compliance documentation
Safety & Standards
- Ensure compliance with:
- Battery safety standards (UL9540A, IEC 62933, IEC 62619)
- Fire detection and suppression systems
- Electrical and site safety practices
- Drive safe commissioning practices and permit-to-work systems on site
Stakeholder Coordination
- Act as primary technical interface on site with:
- OEMs (cell, PCS, EMS)
- EPC partners
- DISCOMs, SLDCs, and third-party inspectors
- Coordinate issue resolution to meet project timelines and performance benchmarks
Required Qualifications & Experience
Experience
- 712 years of experience in:
- BESS, power systems, grid integration, or renewable energy projects
- Hands-on experience in utility-scale BESS commissioning and grid integration is mandatory
- Experience working with Indian DISCOMs / SLDCs is strongly preferred
Technical Skills
- Strong understanding of:
- BESS system architecture (battery sizing, PCS, HVAC, fire systems)
- EMS, SCADA, protection systems, and grid interface
- Familiarity with Indian regulatory framework for BESS applications:
- Renewable integration
- Frequency regulation
- Peak shaving / capacity support
Tools & Standards
- Experience with power system studies tools (ETAP / PSCAD / DIgSILENT working knowledge acceptable)
- Knowledge of CEA regulations, grid codes, and safety standards
Education
- BE / BTech in Electrical Engineering (mandatory)
- MTech in Power Systems (preferred)
Services you might be interested in
Improve Your Resume Today
Boost your chances with professional resume services!
Get expert-reviewed, ATS-optimized resumes tailored for your experience level. Start your journey now.
