Login Sign Up
🔔 FCM Loaded

BESS Pilot Line

Vikram Solar

2 - 5 years

Chennai

Posted: 08/04/2026

Getting a referral is 5x more effective than applying directly

Job Description

Role Purpose

To lead end-to-end prototype development, pilot deployment, and testing & validation of Battery Energy Storage System (BESS) solutions, ensuring product reliability, performance, and compliance prior to commercialization.


Key Responsibilities:


Prototype & Pilot Development

  • Lead development of BESS prototypes from concept to functional validation
  • Define prototype architecture including battery packs, PCS, EMS, and integration components
  • Drive pilot project execution for new BESS solutions in real-world conditions
  • Collaborate with design, system engineering, and product teams for iterative improvements


Testing & Validation Strategy

  • Define validation plans for electrical, thermal, mechanical, and safety performance
  • Establish test protocols aligned with global standards (UL, IEC, BIS, etc.)
  • Oversee functional, performance, and reliability testing of BESS systems
  • Validate system performance across various use cases (grid-scale, C&I, hybrid, etc.)


Lab & Test Infrastructure

  • Set up and manage BESS testing labs and pilot facilities
  • Define equipment requirements for battery, PCS, and system-level testing
  • Ensure calibration, maintenance, and safe lab operations


Compliance & Certification

  • Drive certification readiness for regulatory and customer requirements
  • Coordinate with certification bodies and testing agencies
  • Ensure compliance with grid codes, safety standards, and customer specifications


Data Analysis & Improvement

  • Analyze test results and identify design improvements
  • Lead root cause analysis and corrective actions
  • Provide validation reports for product release and commercialization


Cross-Functional Collaboration

  • Work closely with product design, system engineering, quality, and manufacturing teams
  • Support transition from prototype to production readiness
  • Provide technical inputs for customer demos and pilot deployments


Team Leadership

  • Build and lead a high-performing testing and validation team
  • Drive technical capability development in BESS testing
  • Establish validation governance and documentation practices

Key Skills

  • Strong expertise in BESS system architecture and integration
  • Experience in battery testing, PCS validation, and EMS functionality
  • Knowledge of global BESS standards (UL 9540, IEC 62619, IEC 62933, etc.)
  • Strong analytical and problem-solving skills
  • Experience in pilot deployment and field validation
  • Leadership and stakeholder management

Experience

  • 15+ years in energy storage, power systems, or power electronics
  • Minimum 5+ years in BESS testing, validation, or prototype development
  • Experience in grid-scale or C&I BESS solutions preferred

Qualification

  • B.E./B.Tech in Electrical / Electronics / Power Systems
  • M.Tech or specialization in Energy Storage / Power Systems (preferred)

Success Metrics

  • Successful prototype-to-commercialization cycle time
  • Product validation readiness and certification approvals
  • Reliability and performance benchmarks achieved
  • Effective pilot project execution
  • Smooth transition to manufacturing readiness

#BESS #Pilotline

Services you might be interested in

Improve Your Resume Today

Boost your chances with professional resume services!

Get expert-reviewed, ATS-optimized resumes tailored for your experience level. Start your journey now.